The leveled area between the pavement and the hill of exposed soil should slow runoff and prevent sediment from pouring into the street. |
|
|
Here, a section of the silt fence has collapsed. |
|
Fiber rolls are placed in sequence to slow runoff and trap sediment. |
||
Here the soil has been roughened to decrease runoff velocity. The soil has been also covered with a fiber matrix to hold the soil in place. |
||