Construction Site 6

The leveled area between the pavement and the hill of exposed soil should slow  runoff and prevent sediment from pouring into the street.

 

Here, a section of the silt fence has collapsed.

 

Fiber rolls are placed in sequence to slow runoff and trap sediment.

 

Here the soil has been roughened to decrease runoff velocity. The soil has been also covered with a fiber matrix to hold the soil in place.