Construction Site 2
|
Huge mounds of steeply sloped dirt and almost completely bare
ground make the erosion potential at this site enormous. To the contractor's
credit, the erosion potential has been greatly reduced by significant placement
of structural BMPs. |
|
|
||
Another view shows the large fiber rolls terraced to prevent channeling and soil loss on the slope. A silt fence extends all the way around the dirt mound. |